Skip to content
Public demo · no signup

Design nature on a real site. See the return in 60 seconds.

Drop a UK postcode or pick a Golden Scenario. The same heat, runoff, biodiversity and Green Book engines we ship in production turn your sketched interventions into a sourced, pounds-avoided return — no workspace, no signup.

Try your own location · 60 seconds

Drop any UK postcode or address. Get a candidate quantified return — pounds avoided — on the screen.

We hash the address into representative climate, soil and population layers, run the same engines we ship in production, and surface a single decision-ready figure. Nothing is stored.

Demo only — uses representative layers, not your live cadastral data. Sign up for a real workspace to plug in your own geometry.

What you’re looking at
Dubai South · UAE

A real Dubai South site, designed with nature-based interventions. The numbers below update as if you’d drawn them yourself — the headline is the quantified annual return in pounds avoided.

See the valuation method
Quantified return · annual
AED 4.82M
Switch site
Heat Mitigation
Proposed interventions
Street Trees (Ghaf / Sidr) · 1.4 km corridorCool Pavement · 2,100 m²Shade Pavilion · 320 m²
Headline
−4.6 °C
Dangerous heat exposure cut at peak (11:00–15:00)
Quantified return · pounds avoided / yr
AED 4.82M
Productivity recovered
+27%
Heat-illness ER visits avoided / yr
184
Surface reflectivity gain
0.18 → 0.41
Payback
3.2 yr
Aligned to
Dubai 2040 Urban Master PlanUAE Net Zero 2050
Magic Moment — live PDF preview
Data view

Heat Mitigation — Dubai South

Problem. Mid-summer felt-temperature peaks at 46.2 °C across the logistics corridor. Outdoor workers lose 38% of productive hours between 11:00–16:00.

Urban Nature Audit solution. 1.4 km shaded pedestrian spine with 380 desert-native street trees (Ghaf, Sidr), 2,100 m² of high-albedo cool pavement and four misting pavilions.

Bröde et al. (2012) UTCI · DOI 10.1007/s00484-011-0454-1
ASLA Cool Pavement Toolkit (2023)
Urban Nature Audit · UrbanCat
Dubai South
UAE
Headline
AED 4.82M
quantified return · pounds avoided / yr
Productivity recovered
+27%
Heat-illness ER visits avoided / yr
184
Surface reflectivity gain
0.18 → 0.41
Payback
3.2 yr
AED 4.82M annual avoided cost · −4.6 °C peak heat. Methodology: Dubai 2040 Urban Master Plan · UAE Net Zero 2050.
Generated 6/29/2026 · Climate via Open-Meteo · Biodiversity via GBIF
↑ Tap Reveal PDF
Next step

Book a working session with our research team

We'll spin up a private workspace seeded with your portfolio's geometry, climate and policy frame — usually within 48 hours.

© UrbanCat · Sandpit fixtures are for demonstration only.
Real workspaces: ~120s to first report.